开发者:上海品职教育科技有限公司 隐私政策详情

应用版本:4.2.11(IOS)|3.2.5(安卓)APP下载

鹏鹏 · 2024年01月04日

请问老师还有必要写这一步吗?用意何在啊

NO.PZ2022123002000003

问题如下:

Pete Aron, portfolio manager for Gulf & Co.’s European technology fund, is concerned about currency fluctuations related to the equity portfolio (the Portfolio). The Portfolio is valued in USD, but has exposure to multiple European currencies, primarily the EUR.

Aron formulates the following market expectations for the coming year:

  • Expected return (in EUR) of the Portfolio: +13.2%
  • Standard deviation (in EUR) of the Portfolio: 15%
  • Expected USD/EUR spot rate in one year: 1.2045 (1 EUR = 1.2045 USD)
  • Standard deviation of the USD/EUR exchange rate: 5%
  • Correlation between the USD/EUR exchange rate and the Portfolio (in EUR): –0.07
The market quotes presented in Exhibit 1 are available from a currency dealer:


Aron considers selling EUR and buying USD using a one-year forward contract to fully hedge the EUR currency risk. He will execute the trade if he can achieve the following risk/return objectives:

Objective 1: Increase the Portfolio’s expected return (in USD) by at least 25 basis points.

Objective 2: Reduce the Portfolio’s expected standard deviation (in USD) by at least 30 basis points.

Determine, based on Aron’s market expectations, whether he should execute the forward trade with respect to each of the following:

i. Objective 1

ii. Objective 2

Justify your response. Show your calculations. (2015 Q9)

Note: Assume a one-year time horizon. Consider each objective independently.

选项:

解释:

Correct Answer:

Objective 1:

Aron should not execute the forward trade because the return objective is not met.

For the USD-based investor, the expected USD return on the USD/EUR is 1.2045/1.1930 – 1 = 0.96%. Since the EUR return on the portfolio is given at 13.2%, the unhedged USD return on the portfolio is calculated as (1 + 0.96%)(1 + 13.2%) – 1 = 14.29%.

If Aron decides to hedge by selling EUR forward, the return on the USD/EUR will be 1.2065/1.1930 – 1 = 1.13% and the return on the hedged portfolio would be (1 + 1.13%)(1 + 13.2%) – 1 = 14.48%.

The difference between the hedged return and the unhedged return is 14.48% – 14.29% = 19 bps, which is less than Aron’s required additional return of 25 bps.

Alternatively, one could calculate the difference between the hedged and unhedged return and get (1 + 14.48%)/(1 + 14.29%) – 1 = 17 bps, which is also less than Aron’s required return.

Objective 2:

Aron should execute the forward trade because the risk objective is met.

If Aron does not execute the trade, the expected unhedged domestic-currency standard deviation is calculated as follows; note that the USD is the domestic currency and the EUR is the foreign currency:

  • σ(RDC) is the standard deviation of the portfolio return in USD.
  • σ(RFX) is the standard deviation of the return of the USD/EUR exchange rate.
  • σ(RFC) is the standard deviation of the equity portfolio return in EUR.
  • ρ(RFC,RFX) is the correlation between the USD/EUR exchange rate returns (changes) and the EUR-denominated equity portfolio returns.

Taking the square root of 0.02395 gives σ(RDC) = 15.48%. If Aron executes the trade, the expected USD portfolio standard deviation equals the standard deviation of the EUR equity position, 15.00%. Therefore, the standard deviation of the portfolio decreases by 15.48% – 15.00% = 48 bps, which is more than Aron’s required decrease of 30 bps.

Alternatively, one could calculate the difference between the hedged and unhedged return and get (1 + 14.48%)/(1 + 14.29%) – 1 = 17 bps, which is also less than Aron’s required return.


请问老师计算这个是什么意思 ,还有必要写这一步吗

2 个答案

pzqa31 · 2024年01月05日

嗨,爱思考的PZer你好:


就是第一种方法算的是 additional return ,这里又说可以算下整体的require return对比一下,本质上没什么差别其实。

----------------------------------------------
虽然现在很辛苦,但努力过的感觉真的很好,加油!

pzqa31 · 2024年01月05日

嗨,爱思考的PZer你好:


他这里只是答案提供了另一种算法,考试的时候答一种就行了。

----------------------------------------------
虽然现在很辛苦,但努力过的感觉真的很好,加油!

  • 2

    回答
  • 0

    关注
  • 101

    浏览
相关问题

NO.PZ2022123002000003 问题如下 Pete Aron, portfoliomanager for Gulf Co.’s Europetechnology fun is concerneaboutcurrenfluctuations relateto the equity portfolio (the Portfolio). ThePortfolio is valuein US but hexposure to multiple Europecurrencies,primarily the EUR.Aron formulatesthe following market expectations for the coming year:Expectereturn (in EUR) of the Portfolio: +13.2%Stanrviation (in EUR) of the Portfolio: 15%ExpecteUSEUR spot rate in one year: 1.2045 (1 EUR = 1.2045 USStanrviation of the USEUR exchange rate: 5%Correlation between the USEUR exchange rate anthe Portfolio (in EUR): –0.07The market quotespresentein Exhibit 1 are available from a currenaler:Aron consirsselling EUR anbuying USusing a one-yeforwarcontrato fully hee theEUR currenrisk. He will execute the tra if he cachieve the followingrisk/return objectives:Objective 1: Increase the Portfolio’s expectereturn(in US least 25 basis points.Objective 2: Rethe Portfolio’s expectestanreviation (in US least 30 basis points.termine, basen Aron’s market expectations, whether he shoulexecute the forwartra withrespeto eaof the following: i. Objective 1ii. Objective 2Justify yourresponse. Show your calculations. (2015 Q9)Note: Assume aone-yetime horizon. Consir eaobjective inpenntly. CorreAnswer: Objective 1:Aron shoulnotexecute the forwartra because the return objective is not met.For the USbasenvestor, the expecteUSreturn on the USEUR is 1.2045/1.1930 – 1 = 0.96%.Sinthe EUR return on the portfolio is given 13.2%, the unheeUSeturn on the portfolio is calculate(1 + 0.96%)(1 + 13.2%) – 1 = 14.29%.If Aron cis tohee selling EUR forwar the return on the USEUR will 1.2065/1.1930 –1 = 1.13% anthe return on the heeportfolio woul(1 + 1.13%)(1 +13.2%) – 1 = 14.48%.The fferencebetween the heereturn anthe unheereturn is 14.48% – 14.29% = 19 bps,whiis less thAron’s requireaitionreturn of 25 bps.Alternatively, onecoulcalculate the fferenbetween the heeanunheereturn anget(1 + 14.48%)/(1 + 14.29%) – 1 = 17 bps, whiis also less thAron’s requireeturn.Objective 2:Aron shoulxecute the forwartra because the risk objective is met.If Aron es notexecute the tra, the expecteunheemestic-currenstanrviationis calculatefollows; note ththe USis the mestic currenantheEUR is the foreign currency: σ(R) is the stanrviation of the portfolio return in US σ(RFX) is the stanrviation of the return of the USEUR exchange rate. σ(RFis the stanrviation of the equity portfolio return in EUR. ρ(RFC,RFX) is the correlation between the USEUR exchange rate returns (changes) anthe EUR-nominateequity portfolio returns. Taking the squareroot of 0.02395 gives σ(R) = 15.48%. If Aron executes the tra,the expecteUSportfolio stanrviation equals the stanrviation ofthe EUR equity position, 15.00%. Therefore, the stanrviation of theportfolio creases 15.48% – 15.00% = 48 bps, whiis more thAron’srequirecrease of 30 bps. 请问这个在题目中是怎么计算出来的?

2024-02-02 10:27 1 · 回答

NO.PZ2022123002000003 问题如下 Pete Aron, portfoliomanager for Gulf Co.’s Europetechnology fun is concerneaboutcurrenfluctuations relateto the equity portfolio (the Portfolio). ThePortfolio is valuein US but hexposure to multiple Europecurrencies,primarily the EUR.Aron formulatesthe following market expectations for the coming year:Expectereturn (in EUR) of the Portfolio: +13.2%Stanrviation (in EUR) of the Portfolio: 15%ExpecteUSEUR spot rate in one year: 1.2045 (1 EUR = 1.2045 USStanrviation of the USEUR exchange rate: 5%Correlation between the USEUR exchange rate anthe Portfolio (in EUR): –0.07The market quotespresentein Exhibit 1 are available from a currenaler:Aron consirsselling EUR anbuying USusing a one-yeforwarcontrato fully hee theEUR currenrisk. He will execute the tra if he cachieve the followingrisk/return objectives:Objective 1: Increase the Portfolio’s expectereturn(in US least 25 basis points.Objective 2: Rethe Portfolio’s expectestanreviation (in US least 30 basis points.termine, basen Aron’s market expectations, whether he shoulexecute the forwartra withrespeto eaof the following: i. Objective 1ii. Objective 2Justify yourresponse. Show your calculations. (2015 Q9)Note: Assume aone-yetime horizon. Consir eaobjective inpenntly. CorreAnswer: Objective 1:Aron shoulnotexecute the forwartra because the return objective is not met.For the USbasenvestor, the expecteUSreturn on the USEUR is 1.2045/1.1930 – 1 = 0.96%.Sinthe EUR return on the portfolio is given 13.2%, the unheeUSeturn on the portfolio is calculate(1 + 0.96%)(1 + 13.2%) – 1 = 14.29%.If Aron cis tohee selling EUR forwar the return on the USEUR will 1.2065/1.1930 –1 = 1.13% anthe return on the heeportfolio woul(1 + 1.13%)(1 +13.2%) – 1 = 14.48%.The fferencebetween the heereturn anthe unheereturn is 14.48% – 14.29% = 19 bps,whiis less thAron’s requireaitionreturn of 25 bps.Alternatively, onecoulcalculate the fferenbetween the heeanunheereturn anget(1 + 14.48%)/(1 + 14.29%) – 1 = 17 bps, whiis also less thAron’s requireeturn.Objective 2:Aron shoulxecute the forwartra because the risk objective is met.If Aron es notexecute the tra, the expecteunheemestic-currenstanrviationis calculatefollows; note ththe USis the mestic currenantheEUR is the foreign currency: σ(R) is the stanrviation of the portfolio return in US σ(RFX) is the stanrviation of the return of the USEUR exchange rate. σ(RFis the stanrviation of the equity portfolio return in EUR. ρ(RFC,RFX) is the correlation between the USEUR exchange rate returns (changes) anthe EUR-nominateequity portfolio returns. Taking the squareroot of 0.02395 gives σ(R) = 15.48%. If Aron executes the tra,the expecteUSportfolio stanrviation equals the stanrviation ofthe EUR equity position, 15.00%. Therefore, the stanrviation of theportfolio creases 15.48% – 15.00% = 48 bps, whiis more thAron’srequirecrease of 30 bps. 计算δR的时候不是也需要去分hee和unhee的情形吗?答案里面计算的是unhee 情形下的δR如果hee,应该δR=(1+RFX)*δRFC=1.01316*15%=15.1974%然后unhee和hee的两个情形的δR之间作差,计算是不是要执行?我的思路是有什么问题吗?

2024-01-20 20:30 2 · 回答

NO.PZ2022123002000003 问题如下 Pete Aron, portfoliomanager for Gulf Co.’s Europetechnology fun is concerneaboutcurrenfluctuations relateto the equity portfolio (the Portfolio). ThePortfolio is valuein US but hexposure to multiple Europecurrencies,primarily the EUR.Aron formulatesthe following market expectations for the coming year:Expectereturn (in EUR) of the Portfolio: +13.2%Stanrviation (in EUR) of the Portfolio: 15%ExpecteUSEUR spot rate in one year: 1.2045 (1 EUR = 1.2045 USStanrviation of the USEUR exchange rate: 5%Correlation between the USEUR exchange rate anthe Portfolio (in EUR): –0.07The market quotespresentein Exhibit 1 are available from a currenaler:Aron consirsselling EUR anbuying USusing a one-yeforwarcontrato fully hee theEUR currenrisk. He will execute the tra if he cachieve the followingrisk/return objectives:Objective 1: Increase the Portfolio’s expectereturn(in US least 25 basis points.Objective 2: Rethe Portfolio’s expectestanreviation (in US least 30 basis points.termine, basen Aron’s market expectations, whether he shoulexecute the forwartra withrespeto eaof the following: i. Objective 1ii. Objective 2Justify yourresponse. Show your calculations. (2015 Q9)Note: Assume aone-yetime horizon. Consir eaobjective inpenntly. CorreAnswer: Objective 1:Aron shoulnotexecute the forwartra because the return objective is not met.For the USbasenvestor, the expecteUSreturn on the USEUR is 1.2045/1.1930 – 1 = 0.96%.Sinthe EUR return on the portfolio is given 13.2%, the unheeUSeturn on the portfolio is calculate(1 + 0.96%)(1 + 13.2%) – 1 = 14.29%.If Aron cis tohee selling EUR forwar the return on the USEUR will 1.2065/1.1930 –1 = 1.13% anthe return on the heeportfolio woul(1 + 1.13%)(1 +13.2%) – 1 = 14.48%.The fferencebetween the heereturn anthe unheereturn is 14.48% – 14.29% = 19 bps,whiis less thAron’s requireaitionreturn of 25 bps.Alternatively, onecoulcalculate the fferenbetween the heeanunheereturn anget(1 + 14.48%)/(1 + 14.29%) – 1 = 17 bps, whiis also less thAron’s requireeturn.Objective 2:Aron shoulxecute the forwartra because the risk objective is met.If Aron es notexecute the tra, the expecteunheemestic-currenstanrviationis calculatefollows; note ththe USis the mestic currenantheEUR is the foreign currency: σ(R) is the stanrviation of the portfolio return in US σ(RFX) is the stanrviation of the return of the USEUR exchange rate. σ(RFis the stanrviation of the equity portfolio return in EUR. ρ(RFC,RFX) is the correlation between the USEUR exchange rate returns (changes) anthe EUR-nominateequity portfolio returns. Taking the squareroot of 0.02395 gives σ(R) = 15.48%. If Aron executes the tra,the expecteUSportfolio stanrviation equals the stanrviation ofthe EUR equity position, 15.00%. Therefore, the stanrviation of theportfolio creases 15.48% – 15.00% = 48 bps, whiis more thAron’srequirecrease of 30 bps. 题干中说Pete Aron, portfolio manager for Gulf Co.’s Europetechnology fun is concerneabout currenfluctuations relateto the equity portfolio (the Portfolio). The Portfolio is valuein US but hexposure to multiple Europecurrencies, primarily the EUR.一家欧洲的公司,组合用US量;本外币怎么确定?

2023-12-12 01:37 1 · 回答

NO.PZ2022123002000003 问题如下 Pete Aron, portfoliomanager for Gulf Co.’s Europetechnology fun is concerneaboutcurrenfluctuations relateto the equity portfolio (the Portfolio). ThePortfolio is valuein US but hexposure to multiple Europecurrencies,primarily the EUR.Aron formulatesthe following market expectations for the coming year:Expectereturn (in EUR) of the Portfolio: +13.2%Stanrviation (in EUR) of the Portfolio: 15%ExpecteUSEUR spot rate in one year: 1.2045 (1 EUR = 1.2045 USStanrviation of the USEUR exchange rate: 5%Correlation between the USEUR exchange rate anthe Portfolio (in EUR): –0.07The market quotespresentein Exhibit 1 are available from a currenaler:Aron consirsselling EUR anbuying USusing a one-yeforwarcontrato fully hee theEUR currenrisk. He will execute the tra if he cachieve the followingrisk/return objectives:Objective 1: Increase the Portfolio’s expectereturn(in US least 25 basis points.Objective 2: Rethe Portfolio’s expectestanreviation (in US least 30 basis points.termine, basen Aron’s market expectations, whether he shoulexecute the forwartra withrespeto eaof the following: i. Objective 1ii. Objective 2Justify yourresponse. Show your calculations. (2015 Q9)Note: Assume aone-yetime horizon. Consir eaobjective inpenntly. CorreAnswer: Objective 1:Aron shoulnotexecute the forwartra because the return objective is not met.For the USbasenvestor, the expecteUSreturn on the USEUR is 1.2045/1.1930 – 1 = 0.96%.Sinthe EUR return on the portfolio is given 13.2%, the unheeUSeturn on the portfolio is calculate(1 + 0.96%)(1 + 13.2%) – 1 = 14.29%.If Aron cis tohee selling EUR forwar the return on the USEUR will 1.2065/1.1930 –1 = 1.13% anthe return on the heeportfolio woul(1 + 1.13%)(1 +13.2%) – 1 = 14.48%.The fferencebetween the heereturn anthe unheereturn is 14.48% – 14.29% = 19 bps,whiis less thAron’s requireaitionreturn of 25 bps.Alternatively, onecoulcalculate the fferenbetween the heeanunheereturn anget(1 + 14.48%)/(1 + 14.29%) – 1 = 17 bps, whiis also less thAron’s requireeturn.Objective 2:Aron shoulxecute the forwartra because the risk objective is met.If Aron es notexecute the tra, the expecteunheemestic-currenstanrviationis calculatefollows; note ththe USis the mestic currenantheEUR is the foreign currency: σ(R) is the stanrviation of the portfolio return in US σ(RFX) is the stanrviation of the return of the USEUR exchange rate. σ(RFis the stanrviation of the equity portfolio return in EUR. ρ(RFC,RFX) is the correlation between the USEUR exchange rate returns (changes) anthe EUR-nominateequity portfolio returns. Taking the squareroot of 0.02395 gives σ(R) = 15.48%. If Aron executes the tra,the expecteUSportfolio stanrviation equals the stanrviation ofthe EUR equity position, 15.00%. Therefore, the stanrviation of theportfolio creases 15.48% – 15.00% = 48 bps, whiis more thAron’srequirecrease of 30 bps. 题干中没有明确这么说明?

2023-08-06 12:40 1 · 回答